Marine fuel operations · Built for physical bunker suppliers

The bunkering platform that makes every stem defensible.

BunkerOS runs nominations, scheduling, execution, quality auditing and claims on one tamper-proof ledger. Every ISO 8217 verdict is backed by a live regulatory knowledge graph, not a spreadsheet — so when a buyer disputes a delivery, the evidence is already sealed.

Live UAT environment · Fujairah & Dubai · ISO 8217 quality auditing · GraphIQ-backed
BunkerOS operations console showing live barge fleet gantt, ledger head hash and quality divergences
✓
Ledger tamper-proof
Sealed evidence, always
⚓
184,520 MT active
14 stems live
Compliant by design with ISO 8217 marine fuel spec ISO 4259 reproducibility margins MARPOL Annex VI sulphur cap FIPS 140-3 secure shell UAE Fujairah & Dubai jurisdiction stack
The cost-to-feature problem

Legacy bunker ERP is overkill. Spreadsheets are a liability. BunkerOS is the fit.

Bunker suppliers and barge operators are forced to choose between million-dollar maritime ERP suites built for tanker fleets, generic logistics SaaS that has never heard of ISO 8217 or a time-bar clause, or fragile spreadsheets and email threads that fall apart the moment a buyer disputes a delivered quantity. BunkerOS is purpose-built for the middle — real ISO 8217 quality compliance and a real deterministic ledger, right-sized for a supplier's fleet and owned outright rather than rented.

1 ledger
Nomination → scheduling → execution → claims → invoicing, all in one tamper-proof chain
Live GraphIQ
ISO 8217 spec limits resolved against a real regulatory knowledge graph, not hardcoded tables
9 workspaces
Ops, dispatch, credit, claims, finance, barge master, admin, entities, buyers — each scoped to its job
Sealed evidence
Every claim's time bar, ledger reference and evidence bundle locked the moment a dispute is raised
One platform, the whole delivery

Everything a bunker supplier actually needs

Not a generic logistics platform with a fuel bolt-on. Every module is shaped around how physical bunkering actually works — nomination to cash.

AI-assisted nomination intake

Raw email or WhatsApp messages are parsed into structured nominations — vessel, quantity, ISO grade. Advisory only; nothing touches the ledger until a human confirms it.

Live barge fleet scheduling

A real-time gantt across every barge and berth, with conflict detection before a nomination collides with an existing stem.

ISO 8217 quality auditor

Lab certificate values audited against the governing edition and grade — density, sulphur, viscosity, water — with ISO 4259 reproducibility margins and an edition-divergence view.

Claims & disputes workbench

Time-bar tracking, sealed evidence bundles and an advisory response draft the moment a dispute is raised — never the final word, always defensible.

Dual-approved rules-pack governance

Every pricing, tariff and quality rule that governs a calculation is versioned, diffed against the active pack, and requires dual sign-off before it goes live.

Credit & compliance board

Counterparty exposure, credit blocks and compliance status computed deterministically — never left to a spreadsheet formula that silently breaks.

Invoicing & ERP console

Delivery-to-invoice in one flow, itemized and tied back to the ledger entry that created it — reconciles to the cent, on demand.

Buyer portal

Counterparties see their own orders, invoices and claims live, from a mobile-first portal — no phone calls to check delivery status.

Role-based operations

Distinct workspaces for operations, dispatch, credit, claims, finance, barge masters and administrators — each scoped to exactly its job.

See it in action

Real screens from a real, running product

Not mockups. Every screen below is live in the BunkerOS demo environment today.

Nomination intake

Nominations parsed by AI, confirmed by a human

Raw email, WhatsApp or broker messages are dropped in and drafted into a structured nomination — buyer, vessel, quantity, ISO grade, tolerance. Nothing touches the ledger until a human confirms it.

  • Confidence-scored extraction from raw inbound messages
  • Human-in-the-loop confirmation before the ledger is touched
  • Vessel IMO validation and exact-match tolerance fields
BunkerOS nomination intake console with AI-drafted extraction editor
Quality auditing

ISO 8217 verdicts backed by a live knowledge graph

Density, sulphur, viscosity and water are audited against the governing edition and grade using ISO 4259 reproducibility margins — and the spec limits themselves come from a live regulatory knowledge graph, with a local deterministic fallback if it's ever unreachable.

  • Edition-divergence view — the same lab result against every ISO 8217 edition at once
  • Live GraphIQ-backed spec limits, per edition and per grade (RMG380, DMA)
  • AI-assisted lab-certificate PDF transcription — advisory, never a verdict
BunkerOS computations and quality auditor showing ISO 8217 parameter evaluation
Claims & disputes

Defensible before the dispute even starts

The moment a claim is raised, the time bar starts ticking, the evidence bundle is sealed with a ledger-linked hash, and an advisory response draft is ready for a human to confirm.

  • Automatic time-bar tracking per claim, per dispute type
  • Sealed evidence bundle with a ledger-linked hash
  • One-click sealed export for legal or regulator hand-off
BunkerOS claims and disputes manager showing dispute state timeline and sealed evidence
Buyer experience

Your customers see it all too

A clean, mobile-first portal where counterparties track orders, invoices and claims in real time — no phone calls to the operations desk to check delivery status.

  • Orders, invoices and claims live from a single dashboard
  • Invoices post automatically the moment a delivery closes
  • Raise a claim directly — no back-and-forth email threads
BunkerOS buyer portal mobile dashboard showing orders and total value
Watch the demos

See BunkerOS in action

Two brand films — one from the buyer's seat, one from the back office.

Buyer experience

Real-time order & invoice visibility

Track orders, invoices and claims live from your own phone — no phone calls to the operations desk.

Platform walkthrough

Nomination to claim — the full ledger

Operations, AI nomination intake, ISO 8217 quality auditing, claims, rules-packs and credit — the whole back office in one film.

How BunkerOS compares

The winning balance of cost and capability

Stacked against the three ways bunker suppliers run their operations today.

Capability BunkerOS Purpose-built for bunkering Legacy maritime ERP
(tanker-fleet suites)
Generic logistics SaaS
(global vendors)
Spreadsheets / email
ISO 8217 quality auditing, edition-aware ●  Built-in, GraphIQ-backed ◑  Custom module ✕  Not localized ✕  Manual, error-prone
AI-assisted nomination intake ●  Built-in, advisory-only ✕  Not supported ◑  Generic parsing ✕  Manual re-typing
Claims time-bar & sealed evidence ●  Automatic, ledger-linked ◑  Manual tracking ✕  Not supported ✕  Missed deadlines
Dual-approved rules-pack governance ●  Versioned, diffed, dual sign-off ◑  Custom build ✕  No ✕  None
Live barge fleet gantt scheduling ●  Built-in, conflict detection ●  Yes ◑  Generic scheduling ✕  Manual
Mobile-first buyer portal ●  Included ✕  Separate project ◑  Varies ✕  None
Deterministic, tamper-proof ledger ●  Immutable, hash-secured ●  Yes ◑  Varies ✕  Error-prone
Time to go live ●  Weeks ✕  12–24 months ◑  Months ●  Immediate*
Source code ownership & white-label ●  You own & rebrand it ✕  Vendor-locked ✕  Vendor's product ◑  Files only
Hosting & data residency control ●  Your infra, any region ◑  Vendor-defined ✕  Vendor cloud only ◑  Your device
Commercial model ●  One-time perpetual licence ✕  Licence + integrator ✕  Recurring per-seat SaaS ◑  Cheap, then costly

● built-in  ·  ◑ partial / requires work  ·  ✕ not available. *Spreadsheets are "free" until the first disputed delivery, missed time bar, or growth ceiling. Vendor names are illustrative of each category, not endorsements.

The sweet spot

Maximum capability, minimum overhead

Capability →
Legacy ERP
Generic SaaS
Spreadsheets
BunkerOS
Cost / complexity →

Right-sized for bunker suppliers

Fujairah and Dubai-anchored suppliers and barge operators get real ISO 8217 compliance and a real ledger, without a tanker-fleet ERP budget or headcount.

Live in weeks, not a saga

Pre-built ISO 8217 quality logic and rules-pack governance mean you configure and go live — instead of funding a multi-year maritime ERP integration.

Defensible by default, not a project

Sealed evidence, time bars and edition-aware quality verdicts are wired into the workflow — so a claim never catches you without evidence.

Built to scale with the fleet

From your first stem to a multi-berth, multi-barge operation with an active buyer portal — one platform grows with you.

Ownership, not rental

You own your bunkering platform — source code and all

BunkerOS is not SaaS. Under a source-available license you receive a copy of the source code, brand it as your own, deploy it wherever you choose, and keep full control of your data and your roadmap.

The source code is yours

You receive the complete source under a perpetual license. Read every line, audit it, and never be held hostage to a vendor's roadmap or release cadence.

Brand it entirely as your own

White-label from the ground up — your name, logo, colors and domain across the buyer portal and staff console. Ship it to market as your product, not ours.

Host it anywhere

Your cloud, your on-prem data center, your region of choice. No mandatory vendor cloud, no per-seat metering, no usage caps that throttle growth.

Your data never leaves your control

Delivery records, lab certificates and dispute evidence sit in infrastructure you own — making data residency and jurisdiction-specific compliance far simpler to demonstrate.

Customize without limits

Modify and extend the platform for your own trade lanes, grades and workflows. The code is yours to evolve — by your team or ours — as the fleet grows.

Perpetual license

A one-time license to the delivered version, yours to run indefinitely. No subscription that can be switched off, no renewal leverage held over you.

Source-available, not open-source. You get the code for your own internal business use, with the right to brand, host, modify and run it in perpetuity. Reselling it or offering it to third parties as a service is reserved. The full terms are short and in plain English.
Read the license terms →
Built for

Whoever you deliver to, BunkerOS fits

⚓

Physical bunker suppliers

Independent and integrated suppliers who need ISO 8217 quality compliance and a real ledger from day one.

🚢

Barge & fleet operators

Live gantt scheduling, conflict detection and offline-first execution logs for every barge in the fleet.

⚖️

Claims & compliance teams

Sealed evidence, automatic time bars and edition-aware quality verdicts, built for defensibility.

📱

Buyers & charterers

A mobile-first portal to track orders, invoices and claims — no phone calls to the ops desk.

Who builds & delivers BunkerOS

Enterprise software pedigree, delivered at AI speed

BunkerOS pairs decades of business-critical engineering with an AI-powered delivery model — so you get depth and speed, not a trade-off between them.

B

BlastAsia Inc.

Implementation partner

For 25 years, BlastAsia has built and implemented business-critical software for global enterprises — bringing deep engineering discipline, domain expertise and delivery rigor to every BunkerOS deployment.

  • A quarter-century building global, business-critical systems
  • Enterprise-grade engineering & delivery practices
  • Hands-on, local implementation and support
X

Xamun.ai

AI-Powered Software Factory

Xamun is an AI-powered software factory that brings speed and reliability to commercial software delivery at scale — compressing what once took years into months, without sacrificing quality.

  • AI-accelerated build and delivery
  • Reliability and quality engineered in at scale
  • Faster time-to-market for commercial software

See BunkerOS run your delivery book

Book a 30-minute walkthrough, or jump straight into the live demo environment and click through it yourself.